Name Sort descending | Download Type Sort descending | Download |
---|---|---|
Certification |
File
SmartTec_EN_Triflex GmbH Co KG_IAC GOLD.pdf
(558.77 KB)
|
|
To accommodate the vast amount of visitors parking, 111 Piccadilly boasts an open, surface car park to the rear that straddles the Rochdale canal. Inspection, identified that the existing macadam surfacing had degraded, through constant trafficking and exposure to the elements. |
Case study |
File
111 Piccadilly - Case Study.pdf
(3.2 MB)
|
Tween Bridge wind farm consists of 22 turbines that, per annum, generate up to 44MW of power, providing 300,000 homes with their annual electricity needs. |
Case study |
File
Abbey Duck Pond -Case Study.pdf
(3.35 MB)
|
Case study |
File
Airport-Fire-Station_3.pdf
(4.57 MB)
|
|
Triflex, working with ProSure authorised contractor Weatherproofing Advisors Ltd. have completed renovations to a 100m² roof at the busy student accommodation complex Arena Village, located in the heart of Leeds city centre. |
Case study |
File
Arena Village Leeds.pdf
(532.36 KB)
|
Asda Frome
The ASDA store at Frome had been experiencing severe water ingress to areas holding perishable stock for a number of years. The existing single-ply membrane had reached the end of its serviceable life and there were high levels of blistering coupled with splits to the membrane at lap joints. |
Case study |
|
The single 3,000m² storey car park at the popular Asda store in Huyton, Liverpool was showing significant signs of deterioration and was in need of urgent renovation. The existing asphalt substrate was installed a number of years earlier and had been subject to high levels of trafficking and exposure to the elements. |
Case study |
File
Asda Huyton AG.pdf
(1.94 MB)
|
This project required a waterproofing and surfacing solution that would meet the tight deadline to restore a council car park before the busy tourist season. |
Case study |
File
Avenue Road, Bournemouth, Case Study.pdf
(2.36 MB)
|
Case study |
File
Bath-Podium-Car-Park.pdf
(5.94 MB)
|
|
Case study |
File
The-Podium-Bath-CS.pdf
(20.52 MB)
|
|
Case study | ||
Case study |
File
Callaghan-Square-Cardiff-CS.pdf
(5.56 MB)
|
|
The new luxury multi-residential development at Camlet Way, Herefordshire have recently recieved refurbishment to several areas including a 300m² roof, 100m² roof terrace and a further 100m² of balconies. |
Case study |
File
Camlet Way.pdf
(2.9 MB)
|
Cold liquid applied waterproofing, surfacing, coating and protection systems for car parks. |
Brochure |
File
Car Park Solutions 2022_WEB.pdf
(12.72 MB)
|
Maintenance, care and cleaning |
Download centre
301
Total Downloads
1-15 of 315 Downloads