| Name Sort descending | Download Type Sort descending | Download | 
|---|---|---|
| Certification | File ETA Triflex SmartTec 2022 EN.pdf
  (363.36 KB)
 | |
| Certification | File CERT Follmann Chemie ISO 14001 04-20 EN.PDF
  (401.99 KB)
 | |
| Certification | File CERT ISO 50001_2018 Follmann Chemie EN 2026.PDF
  (415.08 KB)
 | |
| Brochure | ||
| Certification | File CERT ISO 14001_2015 Follmann Chemie EN 2026.PDF
  (415.09 KB)
 | |
| Case study | File Footasylum-Manchester-CS.pdf
  (3 MB)
 | |
| Forster Park Primary School Forster Park Primary School undertook extensive building and refurbishment works to the school’s 500m² lower roof which was originally overlaid in an SBS felt. The school required a solution that posed no risks to those on site, could be quickly installed and would be fully warranted for peace of mind. | Case study |  | 
| Refurbishment of external parking area of multi-storey car park with buried heating loop. | Case study | File Gateshead_College_Baltic_Campus.pdf
  (5.53 MB)
 | 
|   Trade associations representing the flat roofing industry have joined together to issue new guidance in response to changes to fire safety legislation. (Updated March 2024) | Brochure | |
| The Hanover School, Islington is ideally located alongside the Regents Canal in London, the school boasts fantastic views from its well-known roof top playground. | Case study | |
| Triflex were invited by Conor Maher of Albany Brent a Triflex Authorised Contractor, to provide a Project Specification for an insulated waterproofing solution for a blue roof at Hill House, North London. | Case study | File Hill House Case Study.pdf
  (1.79 MB)
 | 
| Overlay solution for asphalt car park deck and concrete ramp. | Case study | File Hodge-House-Cardiff-CS.pdf
  (7.47 MB)
 | 
| Cold liquid applied roof waterproofing and protection systems. | Brochure | |
| This project required the waterproofing and protection of a 1,200m² flat roof including all detailed areas at John F. Kennedy School in Beckton, East London. The current roof had previously been waterproofed using a traditional felt waterproofing system, which had begun to develop blisters. | Case study | File John F Kennedy School.pdf
  (3.65 MB)
 | 
| The 2500m² flat room of this hotel consited of asphalt and a bituminous membrane. The substrate was now allowing water to ingress into below rooms causing serious damage, in some areas the ingress had become so severe that rooms had to be completely closed off to guests. | Case study | 
Download centre
          313
          Total Downloads
        
          
        31-45 of 324 Downloads
      
    
              
      