Name Sort descending | Download Type Sort descending | Download |
---|---|---|
Brochure |
File
Car Park Solutions 02-25.pdf
(11 MB)
|
|
Maintenance, care and cleaning | ||
Brochure | ||
Reservoir roof refurbishment. |
Case study |
File
Reservoir-Roof-CS.pdf
(5.25 MB)
|
Water treatment works. |
Case study |
File
Water-Treatment-Works-CS.pdf
(11.55 MB)
|
The existing asphalt roof at the Royal Albert Hall in London required an overlay with particular care to the expansion joints to allow for movement within the building. |
Case study |
File
Royal Albert Hall case study.pdf
(6.04 MB)
|
Follmann Chemie corporate social responsibility report. |
Certification |
File
CERT CSR Performance Overview 2020 01-20 EN.pdf
(108.23 KB)
|
Waterproofing and protection. |
Case study | |
Concrete roof refurbishment. |
Case study |
File
Durdham_Water_Tower.pdf
(5.09 MB)
|
The residential apartments at Eastland Homes requested a waterproofing and surfacing solution that would include both an insulated element, to improve energy efficiency and a durable waterproofing layer to their cantilever walkways. |
Case study |
File
Eastland Homes- Roof and walkways.pdf
(2.52 MB)
|
Car park refurbishment due to water ingress. |
Case study |
File
Edinburgh-College-CS.pdf
(14.52 MB)
|
Waterproofing solution for a stadium roof. |
Case study |
File
Emirates-Stadium-London-CS.pdf
(9.08 MB)
|
Certification |
File
DOC-EPD-DBC-20190118-IBE1-EN_0.pdf
(2.04 MB)
|
|
Certification |
File
DOC-EPD-DBC-20190117-IBE1-EN_0.pdf
(2.04 MB)
|
|
Certification |
File
DOC-EPD-DBC-20190116-IBE1-EN_0.pdf
(2.04 MB)
|
Download centre
308
Total Downloads
16-30 of 322 Downloads