Are you looking for a Triflex system? Go to the Triflex system finder.
760 results found
Triflex ProTerra Insulated
Featuring high quality warm roof insulation, an impact resistant topping and a durable and decorative waterproofing and surfacing layer.
www.triflex.co.uk/systems/walkways-balconies-and-terraces/triflex-proterra-insulated/triflex-proterra-insulated-technicalJersey Opera House
Preserving history with modern waterproofing solutions.
www.triflex.co.uk/jersey-opera-houseOverlay solutions
www.triflex.co.uk/overlay-solutionsMaidstone Hospital
Concrete helipad refurbishment.
www.triflex.co.uk/maidstone-hospitalLRWA Trainer of the Year 2026
Shane Copestake is celebrated as the winner of the prestigious LRWA Trainer of the Year Award 2026. His win recognises years of dedication to raising industry standards, nurturing thousands of trainees, and strengthening professional excellence across the UK.
www.triflex.co.uk/lrwa-trainer-year-2026Approvals and certification
www.triflex.co.uk/about-us/approvals-certificationTriflex at the RICS Building Surveying Conference 2026
Triflex is pleased to confirm we will be at the RICS Building Surveying Conference 2026, taking place on 7 May 2026 at Convene, 155 Bishopsgate, Liverpool Street, London EC2M 3YD
www.triflex.co.uk/rics-building-surveying-conference-2026Why condition surveys are essential for multi-storey car parks
Multi-storey car parks face some of the harshest exposure conditions in the built environment. Constant traffic loading, rainwater, de-icing salts, temperature changes and ageing construction materials all combine to create a challenging environment for reinforced concrete structures.
www.triflex.co.uk/why-condition-surveys-are-essential-multi-storey-car-parksThe relationship between galvanic anodes and Triflex waterproofing systems in multi-storey car park refurbishment
Multi-storey car parks are exposed to a unique combination of mechanical, chemical and environmental stresses, that accelerate the deterioration of reinforced concrete. Water penetration, de-icing, coastal and cast in chlorides, carbonation and temperature changes all contribute to corrosion of reinforcing steel, which in turn leads to cracking, spalling and a decline in structural capacity.
www.triflex.co.uk/relationship-between-galvanic-anodes-and-triflex-waterproofing-systems-multi-storey-car-parkThe role of Triflex waterproofing, surfacing and protection systems in safeguarding multi-storey car parks
Multi-storey car parks face continuous exposure to harsh environmental and operational conditions. Frequent vehicle movement, rainwater, freeze / thaw cycles and de-icing salts all place considerable stress on reinforced concrete structures.
www.triflex.co.uk/role-triflex-waterproofing-surfacing-and-protection-systems-safeguarding-multi-storey-car-parksTriflex 2026 Easter opening times
The Triflex office will be closed for the Easter break from 5:00pm on Thursday 2 April and we will re-open at 9:00am on Tuesday 7 April 2026.
www.triflex.co.uk/triflex-2026-easter-opening-times